50m Pool Update

Posted: 25th January 2016

The pool build is on track and the the construction is going well. If you drive past the site you will see that the main concrete slab for the pool has been set in place. The balance tank that holds any water displacement is now in situ. The block work for the link building to the 25m pool is under construction.

Categories: Archive News Blog School News
AEGIS